(Joel and Linda)

Well the start of the month is off with a bang. Linda is working hard on the upstairs bathroom and that is requiring sanding the old paint and working on the walls making them ready for the paint primer. We have the new sink, cabinet and medicine cabinet and the wall had to be opened up for that. This house was built when dry wall first came out and it was very thick so when I had to cut the wall open I distroyed numerous saw blades. Hopefully we will be able to show after pictures of the bathroom and it will be a lot nicer. We are going to put in new flooring as this floor had been in since the 30’s when the house was built. We will also need a new light fixture and that would be the last item to get.

Before

bathroom-1b.jpg  bathroom-2.jpg bathroom-3.jpg

After

 

bathroom-1a.jpg bathroom-2a.jpg bathroom-3a.jpg

I have been working on the banisters on the stairwell and have them in for a while but there is more work to be done with paint on the walls as soon as we can figure out how to put a ladder on the stairs and then stain the railings.

banister-1.jpg banister-2.jpg

(Bob and Joellen)

Well the Milwaukee Wisc summerfest kicked off in late June and early July and Sara had a chance to play sax in the Jazz band at the fest.

joellen-10.jpg sara-10.jpg sara-11.jpg sara-12.jpg

 


“Click for Ironwood, Michigan Forecast”